Industrial IoT Pilot for One Production Line or Machine Group

The Industrial IoT Pilot is for manufacturers ready to prove value on one production line or defined machine group: we deliver gateway and data acquisition, a dashboard, alerts, an acceptance test and a rollout recommendation. You see real machine data and measurable results before committing to a plant wide deployment.

Technically reviewed by the EmbedCrest engineering teamUpdated

Pricing: On Request

Who this is for

  • Plant head or operations director
  • Manufacturing engineering manager
  • Maintenance manager
  • IT or OT manager
  • Digital transformation lead

Outcomes we work towards

  • Live, trusted machine data from one line
  • Measured results against an agreed baseline
  • Validated architecture before plant wide rollout
  • A rollout plan based on pilot evidence

Plant wide rollouts without proof carry high risk

Committing to plant wide Industrial IoT before proving data quality, user adoption and measurable value is a large gamble. Vendor demos run on clean data, not on a twenty year old press with an undocumented controller. Without a pilot, teams discover integration issues, unreliable signals and dashboards nobody uses after the full budget is spent. A tightly scoped pilot on one line answers those questions with real data and limits the investment until value is shown.

Scope

What We Design, Build and Hand Over

  • Pilot definition confirming line or machine group, data points, KPIs and acceptance criteria
  • Industrial gateway configuration for PLC, machine and sensor data acquisition
  • Retrofit sensor integration where machines expose no usable controller data, when agreed in the SOW
  • Secure data path from gateway to on premises or cloud platform
  • Dashboard for agreed views such as OEE, downtime, cycle count or machine state
  • Alert rules for stoppages, thresholds or condition changes, routed to agreed recipients
  • Acceptance test verifying data accuracy against machine counters and operator records
  • Operator and maintenance team walkthrough of dashboards and alerts
  • Rollout recommendation with architecture, effort and lessons from the pilot
Architecture

Pilot architecture from machine to dashboard

The pilot builds a complete but limited data path for one line, using the same layers a plant wide rollout would use, so architecture, security and data quality are validated at small scale.

  1. Step 1

    Machines and PLCs

    Existing controllers and machines on the pilot line, with control logic left unchanged

  2. Step 2

    Sensors and retrofit

    Added current, vibration or count sensors where controller data is missing

  3. Step 3

    Industrial gateway

    Protocol acquisition, local buffering and store and forward during network outages

  4. Step 4

    Secure transport

    Encrypted MQTT or OPC UA link across a segmented OT network

  5. Step 5

    Data platform

    Time series storage and event processing on premises or in the cloud

  6. Step 6

    Dashboards and alerts

    Line level views and notifications for operators, maintenance and managers

Pilot architecture from machine to dashboard
Use Cases

Where Teams Use This

OEE visibility on a bottleneck line

A plant suspects its bottleneck line loses capacity to short stops. The pilot captures machine states and counts to show availability, performance and quality losses that manual logs miss.

Downtime alerts for critical machines

Maintenance learns about stoppages late. The pilot sends alerts on machine stops and threshold breaches, so the team can measure response times and recurring causes on a defined machine group.

Condition monitoring trial

A maintenance team wants to test vibration or current monitoring on motors and spindles before wider investment. The pilot collects condition data and validates whether signals are useful.

Energy visibility per line

Energy costs are known per site, not per line. The pilot meters a line and correlates consumption with production, giving a measured view of energy per part.

Process

How the Work Runs

  1. Pilot definition

    We confirm line, machines, data points, KPIs, baseline and acceptance criteria, ideally from a completed readiness assessment, and agree the SOW.

  2. Design and preparation

    Engineers finalise architecture, gateway configuration, network and security design, and coordinate installation requirements with your team.

  3. Connection and data acquisition

    We configure gateways and integrate PLCs, machines and sensors, then verify signals against machine counters and operator observations.

  4. Dashboards and alerts

    We build the agreed dashboard views and alert rules, and review them with operators and maintenance for usefulness and clarity.

  5. Acceptance and measurement

    The acceptance test confirms data accuracy and function, then results are measured against the baseline over the agreed window.

  6. Rollout recommendation

    We report pilot results, lessons and a recommended architecture, phasing and effort estimate for wider deployment.

Deliverables

What You Receive

  • Pilot scope and acceptance criteria document
  • Configured gateway and data acquisition for the pilot line
  • Dashboard with agreed views
  • Alert rules and notification routing
  • Acceptance test report
  • Pilot results against baseline
  • Architecture and configuration documentation
  • Rollout recommendation with effort estimate

Have a similar challenge?

Share a short brief; an engineer replies within one business day. How engagements work

Discuss an Industrial IoT Pilot
FAQ

Questions About Industrial IoT Pilot

Why pilot one line instead of the whole plant?

A single line pilot proves data quality, user adoption and measurable value with limited investment and disruption. Integration issues, unreliable signals and dashboard changes are found at small scale, where they are cheap to fix. The rollout recommendation then rests on evidence from your own machines rather than vendor assumptions.

Do we need a readiness assessment before the pilot?

It is recommended but not mandatory. If you already know the target line, machines, protocols, network constraints and success metrics, we can scope the pilot directly. If those are unclear, a Factory IoT Readiness Assessment first reduces the risk of choosing the wrong line or underestimating integration work.

How is OEE calculated from machine and PLC data?

Overall equipment effectiveness (OEE) multiplies availability, performance and quality. Availability uses machine run and stop states, performance compares actual cycle counts with ideal cycle time, and quality uses good versus rejected parts. A pilot collects these signals automatically from PLCs or sensors, then validates them against operator records.

Will the pilot interrupt production?

The pilot is designed to avoid modifying PLC control logic and to read data passively where possible. Some steps, such as installing sensors or connecting a gateway to a controller network, may need a short planned window, which is scheduled with your production team in advance.

Can the pilot hardware and software be reused for rollout?

Yes, that is the intent. The pilot uses the same architecture layers a plant wide deployment would use, so gateways, configuration patterns, dashboards and alert logic can be extended. The rollout recommendation states what can be reused and what must change at larger scale.

Ready to Scope Industrial IoT Pilot?

Share your product or plant context. An engineer reviews it and replies with questions, a proposed approach and next steps.

Discuss an Industrial IoT Pilot
Discuss an Industrial IoT Pilot