Factory IoT Readiness Assessment for Manufacturers
The Factory IoT Readiness Assessment is for plant heads and manufacturing leaders planning machine monitoring or Industrial IoT: we deliver a plant discovery, PLC and machine inventory, protocol matrix, network and security review, pilot scope, architecture and ROI model method. You move to a pilot with a realistic scope and business case.
Pricing: On Request
Who this is for
- Plant head or operations director
- Manufacturing engineering manager
- Maintenance manager
- IT or OT manager
- Digital transformation lead
Outcomes we work towards
- Clear visibility of which machines can be connected and how
- A pilot scope tied to a measurable business problem
- Known network and security risks before installation
- A documented method to estimate return on investment
Factory IoT projects stall on unknown machines and networks
Many factory IoT initiatives start with a dashboard demo and stall when they meet the real plant: PLCs from different vendors and decades, machines with no exposed data, undocumented networks and an IT team concerned about connecting OT equipment. Budgets are approved on assumed savings that nobody can measure. A structured readiness assessment shows what data is actually available, what it takes to collect it safely and which pilot is most likely to prove value.
What We Design, Build and Hand Over
- Plant discovery sessions with production, maintenance, IT and OT stakeholders
- PLC and machine inventory: make, model, controller, firmware and available interfaces
- Protocol matrix mapping each asset to Modbus, OPC UA, EtherNet/IP, PROFINET or retrofit sensors
- Network review covering segmentation, existing connectivity and gateway placement options
- OT security review aligned with IEC 62443 concepts and your IT policies
- Use case prioritisation such as OEE, downtime, energy or condition monitoring
- Pilot scope with target line or machines, data points and acceptance criteria
- Reference architecture from machine to gateway, platform and dashboard
- ROI model method defining baseline, metrics and measurement window
Reference architecture produced by the assessment
The assessment ends with a layered architecture for your plant, showing how data flows from existing machines and PLCs to dashboards without replacing production assets or weakening OT network security.
Step 1
Machines and PLCs
Existing controllers, CNC machines and drives inventoried with their available data interfaces
Step 2
Retrofit sensors
Current, vibration or counters for machines that expose no usable controller data
Step 3
Edge gateway
Protocol collection, buffering and store and forward between OT and IT networks
Step 4
Network and security
Segmentation, firewall rules and remote access aligned with IT and OT policies
Step 5
Data platform
On premises or cloud storage for time series data, events and machine context
Step 6
Dashboards and alerts
OEE, downtime, energy or condition views for operators, maintenance and management
Where Teams Use This
Mixed vendor brownfield plant
A plant runs PLCs and machines from several vendors and decades. The assessment inventories each asset, identifies a collection method per machine and shows which can be connected without changing control logic.
Choosing the first Industrial IoT pilot
Management wants to start Industrial IoT but cannot agree where. The assessment ranks candidate lines by data availability, business pain and measurability, then defines one pilot with acceptance criteria.
IT and OT alignment before connecting machines
The IT team is cautious about linking production equipment to the corporate network. The assessment proposes segmentation and gateway placement both teams can review and approve.
Building the business case for investment
Finance asks how savings will be measured. The assessment defines baselines, metrics and the measurement window for the ROI model, so results can be verified after the pilot.
How the Work Runs
Kickoff and data request
We agree objectives, plant areas in scope and stakeholders, and request machine lists, network drawings and current reporting methods.
Plant discovery
Remote or on site sessions, as agreed, walk through lines, machines, controllers and current data flows with production and maintenance teams.
Inventory and protocol matrix
We document each asset, its controller and interfaces, and map a practical data collection method for every machine in scope.
Network and security review
Engineers review network layout, segmentation and remote access with IT and OT owners, then propose gateway placement and controls.
Pilot design and readout
We define pilot scope, architecture and ROI method, then present findings and recommendations to plant and management stakeholders.
What You Receive
- Plant discovery summary
- PLC and machine inventory
- Protocol and data collection matrix
- Network and OT security review
- Prioritised use case list
- Pilot scope with acceptance criteria
- Reference architecture diagram
- ROI model method and template
Have a similar challenge?
Share a short brief; an engineer replies within one business day. How engagements work
Related Pages
- Factory IoT Implementation for Plant and Automation Teams
- PLC Data Acquisition
- Brownfield Retrofit
- Industrial IoT Pilot
- Modbus, OPC UA and MQTT
- Glossary: OEE
- Modbus vs OPC UA vs MQTT: Which Protocol Fits a Factory Gateway?
- SCADA vs MES vs Industrial IoT Platform: What Is the Difference?
- How Do You Connect an Existing PLC to an IoT Dashboard?
- How Do You Deploy Industrial IoT in a Brownfield Factory?
Questions About Factory IoT Readiness Assessment
How do you connect an existing PLC to an IoT dashboard without replacing the PLC?
In most cases an industrial gateway reads data the programmable logic controller (PLC) already exposes, using its native protocol such as Modbus TCP, OPC UA, EtherNet/IP or a vendor driver, without changing control logic. Where a PLC exposes nothing useful, retrofit sensors or a communication module can be added. The assessment determines the right method for each controller in your plant.
How can a manufacturer estimate the ROI of a factory IoT pilot?
Start by measuring a baseline for one problem, such as unplanned downtime, scrap or energy per part, before the pilot. Define the metric, data source and measurement window, then compare the same metric during the pilot and value the change using your own cost figures. The assessment delivers this method and a template, not a promised saving.
Do you need to visit the plant?
Not always. Much of the discovery can be done remotely through video walkthroughs, photographs of nameplates and panels, machine lists and network drawings provided by your team. Where an on site visit adds value, it is agreed and quoted explicitly as part of the scope before work starts.
Which industrial protocols do you assess?
We assess the protocols actually present in your plant, commonly Modbus RTU and TCP, OPC UA, EtherNet/IP, PROFINET and vendor specific PLC protocols, along with options for machines that need retrofit sensors. The protocol matrix records what each asset supports and the recommended collection method.
How do you deploy Industrial IoT in a brownfield factory?
Brownfield deployment starts with an inventory of existing machines and networks, then connects them through gateways and retrofit sensors without stopping production or modifying control logic. A single line pilot proves data quality and value before rollout. The readiness assessment is the first step of that sequence.
Ready to Scope Factory IoT Readiness Assessment?
Share your product or plant context. An engineer reviews it and replies with questions, a proposed approach and next steps.
Request a Factory IoT Assessment