Embedded Test and Validation for Firmware and Connected Devices

EmbedCrest helps OEMs and product teams validate embedded firmware and connected devices before production release, using unit tests, Hardware in the Loop (HIL) and Software in the Loop (SIL) testing, fault injection, static analysis, regression automation and power profiling. The outcome is release decisions based on recorded evidence, fewer field failures, and a smoother path into formal testing at accredited labs.

Technically reviewed by the EmbedCrest engineering teamUpdated

Who this is for

  • Engineering managers and embedded leads
  • EV and battery engineering leads
  • MedTech product and R&D leads
  • Quality and verification managers

Outcomes we work towards

  • Fewer defects found after production release
  • Faster, repeatable regression testing on every build
  • Better confidence in battery life and power budgets
  • Fewer surprises at formal compliance testing

Why manual bench testing is not enough

Many embedded teams validate firmware by hand on a bench: flash a build, press buttons, watch a serial console. That catches obvious faults but misses timing issues, rare error paths, brownouts, communication failures and regressions introduced by later changes. Without automation, every release repeats the same manual effort, and testing is cut when deadlines tighten. Products then fail at formal compliance tests or in the field, where diagnosis and fixes cost far more than catching the problem during development.

Scope

What We Design, Build and Hand Over

  • Test strategy and test plan linked to requirements and acceptance criteria
  • Unit tests for firmware modules on host and, where useful, on target
  • Software in the Loop (SIL) testing with simulated sensors, buses and environments
  • Hardware in the Loop (HIL) test setups for target boards and controllers
  • Fault injection: power loss, bus errors, corrupt data, sensor faults and watchdog recovery
  • Static analysis and regression automation in continuous integration pipelines
  • Current and power profiling to validate sleep modes and battery life estimates
  • Protocol conformance pre checks before formal certification testing
  • Coordination of environmental and compliance testing with accredited labs
Architecture

Layered test approach

Tests run from the cheapest, fastest level up to full system validation. Lower layers run on every change; higher layers run on release candidates and before formal lab testing.

  1. Step 1

    Static analysis

    Coding guideline and defect checks on every commit

  2. Step 2

    Unit tests

    Module logic tested on host, with hardware dependencies replaced by test doubles

  3. Step 3

    SIL testing

    Firmware or models run against simulated sensors, buses and plant behaviour

  4. Step 4

    HIL testing

    Target hardware driven by scripted stimuli, with responses checked automatically

  5. Step 5

    System validation

    End to end functional, fault, power and protocol checks on complete devices

  6. Step 6

    Lab testing

    Environmental and compliance tests at accredited labs, coordinated with the client

Layered test approach
Use Cases

Where Teams Use This

Regression automation for a firmware product line

An OEM with several hardware variants gets an automated pipeline that builds each variant, runs unit tests and static analysis, and executes a HIL smoke test before a release is approved.

HIL testing for a battery management controller

A Battery Management System (Battery BMS) controller is tested against simulated cell voltages, temperatures and CAN traffic, including fault cases that would be unsafe or impractical to create on a real pack.

Power profiling for a battery powered sensor

Current is measured across sleep, wake and radio transmission states to confirm the firmware meets its power budget and to give a measured basis for battery life estimates.

Pre compliance checks before lab testing

Before booking formal tests, firmware behaviour and protocol handling are checked against the relevant specification, so issues are fixed in development rather than discovered during paid lab time.

Process

How the Work Runs

  1. Define test strategy

    We review requirements, risks and standards that apply, then agree test levels, tools, coverage goals and acceptance criteria.

  2. Build test infrastructure

    Unit test frameworks, simulators, HIL fixtures and CI jobs are set up around your hardware and toolchain.

  3. Automate and run

    Tests run automatically on each change or release candidate, with failures triaged and tracked as defects.

  4. Inject faults

    Power, communication and sensor faults are introduced deliberately to confirm recovery behaviour and watchdog handling.

  5. Coordinate lab testing

    We prepare builds, test plans and evidence for accredited labs and support debugging when lab results show issues.

  6. Report and hand over

    Test reports, scripts and infrastructure documentation are delivered so your team can keep running the tests.

Deliverables

What You Receive

  • Test strategy and test plan
  • Unit and integration test suites
  • HIL and SIL test scripts and setup documentation
  • Fault injection test cases and results
  • Power profiling report
  • Protocol pre check results
  • Test reports per release with traceability to requirements
  • CI pipeline configuration for regression testing

Have a similar challenge?

Share a short brief; an engineer replies within one business day. How engagements work

Prefer a fixed scope start? Fixed Scope Engineering Offers

Plan Your Validation Strategy
FAQ

Questions About Test and Validation

How do you validate embedded firmware before production release?

We validate firmware in layers. Static analysis and unit tests run on every change, Software in the Loop (SIL) and Hardware in the Loop (HIL) tests exercise the firmware against realistic inputs, and fault injection checks recovery from power loss, bus errors and bad data. Release candidates then go through system validation against acceptance criteria, power profiling and protocol pre checks, with results recorded in a test report.

What is the difference between HIL and SIL testing?

Software in the Loop (SIL) testing runs the firmware or control model on a computer against simulated hardware and environment, so it is fast and runs early. Hardware in the Loop (HIL) testing runs the real firmware on the real controller, while a test system simulates the sensors, actuators and buses around it. SIL finds logic errors cheaply; HIL confirms timing, drivers and hardware interaction.

Do you have your own test lab and equipment?

We do not list lab equipment on this page. Test setups are agreed per project: HIL fixtures are built around your hardware and the instruments available to the project, and accredited environmental or compliance testing is carried out by partner or client chosen labs. We prepare the test plans, firmware builds and evidence, coordinate with the lab and support debugging when results need investigation.

Can you certify our product for CE, FCC or UL?

No. Certification is issued by accredited test labs and certification bodies, and the product owner is responsible for the compliance claim. We support the process through design for compliance, pre compliance checks, firmware builds with test modes, documentation and debugging when a test fails. That preparation usually reduces the number of lab iterations, but the formal test and certification remain with the lab and the client.

Can testing be automated for an existing product?

Yes, usually incrementally. We start with static analysis and a build pipeline, add unit tests around the modules that change most or fail most often, then build a HIL smoke test for critical functions. Legacy code may need small refactors to make modules testable. Each step adds value on its own, so automation can grow alongside normal feature and maintenance work.

Ready to Scope Test and Validation?

Share your product or plant context. An engineer reviews it and replies with questions, a proposed approach and next steps.

Plan Your Validation Strategy
Plan Your Validation Strategy